Fs-hz102 new energy vehicle BSC2.0 braking system heating curing cooling baking
Specification and model Optional items Product Video
Product No.: fs-zs102
Scope of application: fs-hz102 new energy vehicle BSC2.0 braking system heating curing cooling baking line (Huizhou BYD) robot upper and lower parts provide mes docking
Fs-hz102 new energy vehicle BSC2.0 braking system heating curing cooling baking line robot loading and unloading provides mes docking technical parameters:
1、 Process flow; The beat is 30s; Tooling plate 680 * 550 * 20; Tooling plate weight 20kg; 65 toolings in total; Put 6 products on each tooling plate; 180s beat of each tooling plate; Height 202mm (including tooling plate), curing temperature 130 ℃, heating for 2H; The product cooling temperature is below 30 ℃, and the cooling time is 60min; The whole curing furnace line is divided into two columns and three layers. From the direction of entering the curing furnace, the left column is the heating layer - heating layer - cooling layer from top to bottom, and the right column is the heating layer - heating layer - cooling layer from top to bottom. 001 The tray stops in the loading area and is positioned for the second time. The six sensors at the bottom sense whether there is any product on the tray. The side code reader reads the code on the tray and transmits the information to the manipulator, and waits for the manipulator to load and unload. After the feeding is completed, the 001 tray enters the horizontal elevator, and then arrives at the curing furnace A for waiting. At this time, the side code reader reads the code. The lifting door at Entrance/Exit A is opened, the 001 tray is sent to the curing furnace channel A, moved to the stop at the exit of furnace channel A under the line body handling, stopped moving and baked, and released after 2h. After that, the 002 tray enters the channel B through loading and scanning, solidified at the stop and waited for 2h before being released. After that, the 003 tray enters the C channel through loading and scanning, solidified at the stop and waited for 2H before being released. After that, the 004 tray enters the D channel through loading and scanning, solidified at the stop and waited for 2H before being released. The tray 005 enters the curing channel A and is arranged behind 001. It stops and starts curing, waiting for the release time. The rear trays enter the furnace channel BCD in turn, and so on. When the curing time of 001 tray is met, the exit lifting door of furnace channel A is opened, the tray is moved to the discharge elevator and scanned to record the time of discharging. Then it is lowered to channel E of the cooling furnace through the elevator. At this time, the code is scanned, the cooling furnace door is opened, and the 001 tray enters and runs to the stop for cooling 1H Similarly, tray 002 enters channel F of cooling furnace, tray 003 enters channel E of cooling furnace, tray 004 enters channel F of cooling furnace, tray 005 enters channel E of cooling furnace and circulates in turn. 001 After the cooling time of the tray is met, the lifting door at the outlet of the cooling furnace E opens, enters the horizontal transplanter, scans the code, and records the time when the cooling furnace exits. Then move to the cache line and wait for blanking. Complete a cycle.
1. External dimensions: L * W * H: 11800mm X 3200mm X 2680mm2, equipment structure: overall horizontal layout, four station horizontal transplanter at both ends, curing drying channel and cooling channel in the middle, curing furnace 1 layer, 2 channels in total, 1 layer of cooling channel, 2 channels in total, viewing from the curing furnace outlet, heating curing channel on the left side, and cooling channel on the right side; The conveyor line is 865mm high; It adopts single speed chain conveyor of Deloitte, with medium block cylinder;
3. Temperature range; Normal temperature - 85 ℃ temperature control accuracy; ±1℃
4. Wind direction; Circulating air transportation II. fs-hz102 new energy vehicle BSC2.0 brake system heating, curing, cooling and baking line body structure
1. Equipment color: it is made by bending 2mm cold plate, with surface phosphating, high temperature electrostatic spraying treatment, and shell color of "RAL9003" (color matching according to the color plate provided by the customer);
2. Liner material: 1.5mm TSUS304 stainless steel plate; The internal gear shall be clean, rust proof and corrosion resistant;
3. Electric cabinet: imitating Rittal independent control electric cabinet, equipped with cooling air conditioning unit;
3、 Fs-hz102 new energy vehicle BSC2.0 braking system heating curing cooling baking line robot loading and unloading provide mes docking: free technical training